Timber Fence Cost
Estimate the cost of a timber fence in Australia by length, height and timber type, including the dividing fence rules that decide who pays.
Measure the actual run, not the whole boundary, if you are only replacing one side.
Serve a fencing notice on your neighbour before you start. Every state and territory has dividing fences legislation, and in almost all of them you lose the right to recover a contribution if you build first and ask later.
Steel posts in a timber paling fence are now the mainstream choice because the post is what fails first. A galvanised steel post in concrete outlives a timber post in ground by a wide margin, for a very small price difference.
💰 Ways to save
- Serve the fencing notice properly and early. Under the dividing fences legislation in every state, an adjoining owner is generally liable for half the cost of a sufficient dividing fence, but only if you follow the notice process before work starts. Homeowners routinely forfeit thousands by getting a quote, building the fence and then asking the neighbour to chip in, at which point they have no leverage and no statutory right.
- Choose the standard sufficient fence for your area and pay the upgrade yourself if you want better. If the neighbourhood standard is 1800mm treated pine palings on steel posts and you want merbau with a capping rail, the betterment principle means the neighbour only owes half of the standard fence and you fund the difference. Knowing that in advance lets you decide honestly whether the upgrade is worth your own money.
- Replace the fence in sections if the whole run is not failing. Fences usually rot at the posts and along the bottom rail on the wet or shaded side first, so a targeted replacement of the worst 8m to 12m plus new posts often buys another decade for a third of the cost of a full replacement, and it avoids the notice and cost-sharing process entirely if you cover it yourself.
- Book the fence at the same time as any other earthworks or landscaping. Fencers charge for mobilisation, and if a bobcat is already on site for a retaining wall, driveway or garden works, having the holes augered while the machine is there is far cheaper than a separate visit with hand tools, particularly on clay or rocky ground.
or from $18/week over 5 years , indicative finance
Run a outdoor / landscaping business? Put a calculator like this on your own website, branded as yours.See how →How we estimate this
## What a timber fence costs in 2026
Pricing reviewed: June 2026.
Doing more than just timber fence cost?
Build a combined estimate across every part of your project in one place.
Pricing reviewed June 2026. Indicative Australian costs, not a quote.
Are you a outdoor / landscaping business?
Put this calculator on your own website, branded to you, visitors get an instant estimate, you get a qualified enquiry with their details.
Understanding timber fence costs in Australia
What a timber fence costs in 2026
Timber fencing in Australia is priced per linear metre installed, and the 2026 range for the common products is fairly tight. A standard 1800mm treated pine paling fence with galvanised steel posts runs roughly $110 to $180 a metre supplied and installed, with most suburban jobs landing around $130 to $150. Treated pine on timber posts is slightly cheaper at $100 to $160. Merbau or hardwood palings push the rate to $190 to $300 a metre. A horizontal slat screen fence in hardwood or cypress, which uses more timber and far more labour, runs $260 to $450 a metre. Lower fences cost proportionally less but not linearly, because the posts, holes, concrete and labour barely change, so a 1200mm fence is typically 70 to 80 percent of the 1800mm rate rather than two thirds. A typical 25m suburban boundary replacement therefore sits around $2,800 to $4,500 in treated pine.
Dividing fences, notices and who pays
This is the part that costs people real money, and it is legal rather than technical. Every state and territory has dividing fences legislation, the Dividing Fences Act in NSW, WA and Queensland's Neighbourhood Disputes Act, Victoria's Fences Act, and equivalents elsewhere. The common principle is that adjoining owners are each liable for half the cost of a sufficient dividing fence, where sufficient is judged against the standard of fencing in the locality and the use of the land. Critically, that liability is only enforceable if you follow the process, which almost always means serving a written fencing notice on the adjoining owner setting out the proposed fence, the type, the cost and the quotes, and allowing a statutory period, commonly 30 days, for them to respond or propose an alternative. Build first and ask afterwards and you generally have no statutory right to recover anything. If the neighbour disagrees, most states route the dispute to a civil tribunal, NCAT in NSW, VCAT in Victoria, QCAT in Queensland, which will determine what a sufficient fence is and apportion the cost.
The betterment principle
The second half of the cost-sharing rule is betterment, and it is where expectations usually break down. Your neighbour is liable for half of a sufficient fence, not half of the fence you want. If the standard in your street is 1800mm treated pine palings on steel posts and you want merbau boards, a capping rail, exposed post caps and a stained finish, you can absolutely build that, but the neighbour's contribution is capped at half the cost of the standard fence and you pay the entire difference. The same applies to height. If you want 2100mm for privacy and the local standard is 1800mm, the extra is yours. Understanding this before you get quotes lets you have an honest conversation with the neighbour and avoids the very common situation where an owner assumes a 50 percent split on a premium fence and ends up funding 75 percent of it in a tribunal outcome.
Materials, posts and what actually fails
In a timber paling fence, the post is what dies first. Timber posts in ground rot at the soil line, particularly on the shaded, damp side, and once they go the whole panel leans regardless of how sound the palings are. That is why galvanised steel posts set in concrete have become the mainstream choice for treated pine fencing, adding only a small amount per metre while substantially extending service life. Treated pine palings are typically H3 treated for above ground exposure, and posts should be H4 if timber is used in ground. Merbau and hardwood palings look better and last longer but are heavier, more expensive, and leach tannin heavily for the first six to twelve months, which will permanently stain concrete paths, pavers and rendered walls underneath unless the boards are pre-oiled or the surface is sealed. Expect 10 to 15 years from a treated pine fence with steel posts, 15 to 25 from hardwood if it is maintained.
Site conditions and slope
Ground conditions move the labour component more than the material. Flat, clear ground with soft soil is the baseline. Clay is slow to auger and heavy to dispose of. Rocky ground, common through the Sydney sandstone belt, the Adelaide foothills and parts of Perth, can turn a straightforward post hole into a rock drilling exercise and add 20 to 30 percent to labour. Slope requires the panels to be stepped or raked, which uses more timber, creates gaps under the low edge of each step, and takes longer to set out. Where there is a genuine level change between properties, the retaining structure is not part of the dividing fence at all, it is a separate structure that generally belongs to whoever benefits from the retained soil, and treating it as a shared fence cost is a reliable way to end up in a neighbour dispute. Restricted access that forces materials to be hand carried through a house or down a narrow path adds labour on every delivery.
Approvals and council rules
In most Australian councils a dividing fence on a side or rear boundary up to 1800mm is exempt or complying development and needs no application. Above that height, on a front boundary, on a corner block where sight lines matter, in a heritage conservation area, or where the fence also acts as a pool barrier or a retaining structure, approval requirements change and you should check with the council before ordering materials. Front fences are commonly limited to 1200mm solid or 1800mm if largely transparent, and corner blocks often have a splay requirement near the driveway for visibility. If the fence forms part of a swimming pool barrier it must additionally satisfy AS 1926.1, meaning no gaps over 100mm, no climbable horizontal rails on the pool side, and a clear non-climbable zone, which a standard paling fence frequently fails on.
Getting good quotes
Ask for the quote to be broken into removal and disposal of the existing fence, posts and concrete, framing, palings, gates, and any finishing such as capping or staining. Removal and tip fees alone commonly run $25 to $50 a metre and are the line most often left out of a headline rate. Confirm the timber grade and treatment level, the post material and spacing, and the depth of the footings, because a cheap quote frequently reflects shallower holes and wider post spacing rather than a genuinely better price. Check the fencer is licensed where your state requires it for work above the residential building threshold and carries public liability insurance, and get the neighbour's agreement in writing before work starts, including who is paying what, so the cost-sharing conversation happens once rather than after the invoice arrives.
Frequently asked questions
How much does a timber fence cost per metre in Australia?
A standard 1800mm treated pine paling fence with galvanised steel posts costs roughly $110 to $180 a metre installed, with most suburban jobs at $130 to $150. Merbau or hardwood palings run $190 to $300 a metre, and horizontal slat screen fences $260 to $450. A typical 25m boundary replacement in treated pine lands around $2,800 to $4,500.
Does my neighbour have to pay half the fence?
Generally yes for a sufficient dividing fence, but only if you follow your state's dividing fences process. That means serving a written fencing notice with the proposed fence type, cost and quotes and allowing a statutory response period, commonly 30 days, before work starts. If you build first and ask afterwards you usually have no right to recover a contribution.
What if I want a better fence than my neighbour will pay for?
Under the betterment principle the neighbour is liable for half the cost of a sufficient fence judged by the local standard, and you fund the entire difference for any upgrade. If the street standard is 1800mm treated pine and you want merbau with a capping rail or extra height, the extra is yours to pay.
Do I need council approval for a timber fence?
Usually not for a side or rear dividing fence up to 1800mm, which is exempt or complying development in most councils. Approval is more likely for anything taller, front fences (often capped at 1200mm solid), corner blocks with sight line requirements, heritage areas, or where the fence retains soil or forms part of a pool barrier.
How long does a timber fence last?
Roughly 10 to 15 years for treated pine palings on galvanised steel posts, and 15 to 25 years for hardwood if it is oiled and maintained. The post is what fails first, which is why steel posts set in concrete have become standard, as timber posts rot at the soil line on the damp, shaded side and the panel leans regardless of paling condition.
Is fence removal included in the quote?
Often not. Removing and disposing of the old fence, posts and concrete typically costs $25 to $50 a metre in labour and tip fees, and it is the line most commonly left out of a headline per-metre rate. Ask for the quote split into removal, posts and framing, palings, gates and finishing so you can compare like for like.
Run a outdoor / landscaping business? Add this timber fence cost calculator to your own website →