Fence Panel Calculator
Work out how many fence panels and posts your run needs, and what a panel fence costs installed in Australia.
Panel fences are set out in whole bays, so the run is usually rounded up.
Panel systems come in fixed bay widths, which decides your post count.
Post count is always bays plus one. A 24m run in 2.4m bays is 10 bays and 11 posts, and end or corner posts are a different section to intermediate posts in most systems, so they have to be ordered separately.
Panel fences run in straight lines between posts and cannot follow ground contour, so on any slope the panels are stepped, leaving a triangular gap under each panel that either gets infilled or left open.
💰 Ways to save
- Set out the run so the bays land on whole panels. A 24m run in 2.4m bays is exactly 10 panels, whereas a 25m run needs 11 bays with one cut down, and on most panel systems that offcut is dead waste plus a cut edge that needs sealing. Adjusting the fence line by a few hundred millimetres at a gate or corner often removes a part panel entirely.
- Do the posts yourself and have the panels installed, or vice versa, if you want a middle path on labour. Digging and concreting the post holes is the physically hard but low-skill part, and some installers will price a supply-and-fit on panels only if the posts are already set correctly to their spacing. Confirm this before you dig, because they will not warrant panels on posts they did not set.
- Compare the true installed rate rather than the panel price. Colorbond panel pricing looks cheap per panel but the post, plinth, rail and cap components can be half the material cost again. Ask the supplier for a full bill of materials for your exact run length, including end posts, corner posts, gate posts and caps, so you are comparing complete systems rather than headline panel prices.
- Buy a colour that is currently stocked rather than a special order. Standard Colorbond fencing colours are held in depth and can be picked up or delivered within days, while a non-stock colour can carry a lead time of several weeks and a minimum order quantity, and a replacement panel after storm damage in an unusual colour is a genuine problem years later.
or from $15/week over 5 years , indicative finance
Run a outdoor / landscaping business? Put a calculator like this on your own website, branded as yours.See how →How we estimate this
## What panel fencing costs in 2026
Pricing reviewed: June 2026.
Doing more than just fence panel?
Build a combined estimate across every part of your project in one place.
Pricing reviewed June 2026. Indicative Australian costs, not a quote.
Are you a outdoor / landscaping business?
Put this calculator on your own website, branded to you, visitors get an instant estimate, you get a qualified enquiry with their details.
Understanding fence panels in Australia
What panel fencing costs in 2026
Panel fencing is priced per linear metre installed, and the spread across materials is wide. In 2026 a Colorbond or steel sheet fence at 1800mm costs roughly $95 to $160 a metre installed on a straightforward flat site, making it one of the cheapest durable options in the market. Prefabricated timber lattice panels are cheaper again at $70 to $120 a metre but are screening rather than boundary fencing. Composite or PVC panels run $180 to $290 a metre. Aluminium slat panels, the modern architectural look, are $250 to $450 a metre. Modular concrete sleeper panel systems sit around $170 to $300 a metre and considerably more if they retain soil. DIY materials only typically strips 40 to 50 percent off the installed rate, since panel systems are prefabricated and the labour component is a large share of the price.
Counting panels and posts
The set-out arithmetic is simple and it drives the whole material order. Divide the total run by the bay width to get the number of panels, then add one to get the post count. A 24m run in standard 2.4m bays is 10 panels and 11 posts. A 24m run in 1.8m bays is 13.3 bays, so 14 panels with one cut down and 15 posts. Bay width is fixed by the system, not by you, and the common options are 1800mm, 2400mm and 3000mm. Wider bays reduce the post count and lower the cost per metre, but they load each post more heavily. Note that end posts, corner posts and gate posts are usually a different, heavier section to intermediate posts in most systems, so they must be ordered separately rather than assumed to be part of the post count.
Panels cannot follow the ground
This is the practical limitation that surprises people who have only ever had paling fences. A prefabricated panel is a rigid rectangle, so it runs level between two posts and cannot be raked to follow a slope. On any fall, the run has to be stepped, with each panel sitting level and a step down at each post. That leaves a triangular gap under the low edge of each panel, which is either left open, infilled with a plinth board or concrete sleeper, or accommodated by digging the ground away. Colorbond systems sell a plinth or infill panel specifically for this, at $35 to $80 a metre. On a steep run the accumulated stepping can look severe, and it is one reason paling or slat fencing, which can be raked, is still preferred on sloping blocks.
Wind load, cyclone regions and warranty
A solid panel fence is a sail. Unlike a gapped paling or slat fence, a Colorbond or composite panel presents a continuous surface to the wind, and all of that load goes into the posts and the footings. Manufacturers publish maximum bay widths and required post sections for different wind classifications, and the requirements tighten sharply for exposed sites, coastal frontages, and the cyclone regions of northern Queensland, the Northern Territory and northern Western Australia. Going to 2100mm or 2400mm height increases the load significantly. If you use a wider bay or a lighter post than the manufacturer specifies for your wind classification, the warranty is generally void, and the failure mode in a storm is the whole fence going over rather than a single panel. Ask the supplier to confirm the specification against your address, not just the product.
Approvals and dividing fence rules
In most Australian councils a side or rear dividing fence up to 1800mm needs no approval. Above that, or on a front boundary, corner block with sight line requirements, heritage area, or where the fence retains soil, you should check before ordering. Panel fences on a boundary are subject to the same dividing fences legislation as any other fence, meaning adjoining owners are generally each liable for half the cost of a sufficient dividing fence, enforceable only if you serve a written fencing notice before work starts and allow the statutory response period, commonly 30 days. Under the betterment principle, if the local standard is Colorbond at 1800mm and you want aluminium slat at 2100mm, the neighbour owes half of the standard and you pay the difference. Where a modular concrete sleeper system retains any soil, it stops being a fence and becomes a retaining structure, which usually falls to the owner who benefits from the retained land rather than being shared.
Durability, colours and replacement
Steel panel fencing is popular because it does not rot, does not need painting and holds its appearance for a long time, with typical service life of 15 to 25 years and manufacturer warranties commonly covering the coating for 10 to 15 years in non-marine environments. Coastal sites within a few hundred metres of breaking surf need a marine grade specification or the warranty will not apply. The practical weakness is impact damage, since a dented panel cannot be straightened and has to be replaced. That makes colour availability a long term issue: standard stocked colours can be matched years later, whereas a discontinued or special order colour can be impossible to source after a storm, leaving you with a visibly mismatched panel. Choosing from the current stocked range is worth more than a small aesthetic preference.
Ordering and installation checks
Before ordering, walk the line with a tape and record the exact run lengths between corners and gate positions, because panel systems are ordered as a bill of materials rather than by the metre. Ask for that bill of materials to be itemised: panels, intermediate posts, end posts, corner posts, gate posts, rails, plinths, caps and fixings. Confirm the post hole depth and diameter the manufacturer requires for your height and wind classification, since this is where a cheap installation quietly cuts corners. If you are installing yourself, set a string line and dig every hole before concreting any post, because the panel spans a fixed distance and a post 30mm out of position will not accept the panel and cannot be moved once the concrete has gone off.
Frequently asked questions
How many fence panels do I need?
Divide the total run by the bay width, then add one to get the post count. A 24m run in standard 2.4m bays is 10 panels and 11 posts. Remember that end, corner and gate posts are usually a heavier section than intermediate posts in most systems, so they need to be ordered separately.
How much does a Colorbond fence cost per metre in 2026?
Roughly $95 to $160 a metre installed at 1800mm on a flat site, which makes it one of the cheapest durable fencing options available. Composite and PVC panels run $180 to $290 a metre, aluminium slat panels $250 to $450, and modular concrete sleeper systems $170 to $300. DIY materials only typically strips 40 to 50 percent off the installed rate.
Can panel fencing follow a sloping block?
No, panels are rigid rectangles that run level between posts, so on any fall the fence has to be stepped down at each post. That leaves a triangular gap under the low edge of each panel, which is either left open, infilled with a plinth or sleeper at $35 to $80 a metre, or dealt with by cutting the ground away.
Does bay width affect the cost and strength?
Yes, both. Wider bays mean fewer posts and a lower cost per metre, but each post carries more wind load. Manufacturers publish maximum bay widths and required post sections by wind classification, and the limits tighten sharply on exposed sites and in the cyclone regions of northern Queensland, the NT and northern WA. Exceeding the specification generally voids the warranty.
Do I need council approval for a panel fence?
Usually not for a side or rear dividing fence up to 1800mm. Approval becomes more likely above that height, on a front boundary, on a corner block with sight line rules, in heritage areas, or where the system retains soil. A modular concrete sleeper fence that retains soil is legally a retaining structure, not a dividing fence.
Is a panel fence a realistic DIY job?
It is the most DIY friendly fence type because the panels are prefabricated and the geometry is fixed, but the posts must be plumb, in line and at exactly the right spacing. A post 30mm out of position will not accept the panel, and steel panels cannot be trimmed to length without a specialty tool and losing the factory edge, so set a string line and dig every hole before concreting any of them.
Run a outdoor / landscaping business? Add this fence panel calculator to your own website →