The Renovation Maths Nobody Does Before Signing the Contract

Price the two most common jobs honestly, add the overrun the research says is coming, and the comfortable story about renovating adding value falls apart before the demolition starts.

47
services priced
$8,750
typical (median) price
$2,400,000
dearest: Townhouse Construction
$80
cheapest: Laminate Flooring
TL;DR
  • Do a kitchen and a bathroom for about $55,000, and even at the 85% recovery that agents themselves quote you lose roughly $8,250. At the bottom of their range, 50%, you lose $27,500.
  • The 10% over-capitalisation rule means $55,000 of work needs a $550,000 home just for two rooms to stay inside the line.
  • Across 16,000-plus building projects the average cost overrun is 62% (Flyvbjerg). Apply it to a $22,500 bathroom and you are planning for roughly $36,450.
  • A reality-TV "luxury bathroom" was built for about A$18,000 after the contestants rebuilt it, around 20% below a real Australian bathroom before anything goes wrong.
  • 2,832 building companies went insolvent in FY2024, up 28%, and your deposit sits in the builder's ordinary bank account, not a trust account.

Start with the two rooms everyone does, and the number stops being comforting

Begin with the job most Australian households choose. A kitchen ($32,500) and a bathroom ($22,500), done together, land at roughly $55,000. That pairing is not a worst case. Budget Direct's 2024 survey found kitchens and bathrooms are the two most popular renovations by a wide margin, chosen by close to two-thirds of renovators. These are the rooms people believe pay for themselves.

Run the recovery figures the industry quotes and the belief does not survive contact with arithmetic. Agents and renovators put kitchen and bathroom return on investment somewhere between 50% and 85%. At the flattering top of that range, 85%, $55,000 of work hands back about $46,750 and you are down $8,250. At the bottom, 50%, you get $27,500 back and lose $27,500. There is no point in the quoted band where the two most common jobs in the country break even on resale.

Treat this as a bounding argument, because the percentages deserve suspicion. No rigorous independent Australian room-by-room ROI study exists. The 50-to-85% figures come from parties who profit when you say yes: the agent listing the house, the renovator quoting the job. So this is the generous end of the case. If even the most self-interested number on the table books a loss, the honest number books a larger one. There is also the over-capitalisation rule of thumb that lenders and finance guides repeat, spend no more than about 10% of the home's value on improvements, and $55,000 of work implies you need a home worth about $550,000 for just these two rooms to stay inside that guide. Below that, you are over-capitalising before you have touched the garden.

The official $56.2bn number cannot see the renovations most people actually do

KPMG put renovation activity at $56.2 billion in 2025-26, up around 5% on the year and near its 2021-22 peak, now 37% of all housing spending. It is a real figure and it is partly blind by design. The Australian Bureau of Statistics only counts residential renovation work valued at $10,000 or more that is large enough to need council approval. Everything cheaper, and everything cosmetic, never enters the headline.

That exclusion swallows most of what households spend money on. A flat-pack kitchen ($5,500) sits under the line. So does swapping a benchtop, whether you choose a Caesarstone slab ($5,500) or a granite one ($6,250). A laundry refresh ($8,000), a kitchen island ($8,750), a plastering job ($3,750), a glass splashback ($2,300), a single electrician call-out ($1,350), all of them fall below $10,000 and none of them registers in the official count.

The $56.2 billion describes the approvals-visible, big-ticket tier, kitchens pushed into larger footprints and full-room rebuilds, while the cheap-reno economy that most people recognise as renovating runs underneath it unmeasured. When a politician or a lender cites the renovation boom, they are citing the tier that needs permits. The cabinet ($12,500) swap your neighbour did on a weekend is not in it.

The overrun is a measured constant

The reason renovations blow budgets has a name and a number. Daniel Kahneman and Amos Tversky identified the planning fallacy in the late 1970s, the systematic habit of judging your own project by its best case while ignoring how similar projects actually went. Bent Flyvbjerg later put a figure on it: across more than 16,000 building projects, the average cost overrun is 62%, and the overruns carry a fat tail, meaning the worst ones are much worse than the average suggests.

Price that against a real job. A bathroom ($22,500) at $22,500, carried through a 62% overrun, becomes about $36,450. That is the planning number almost nobody writes down, because the optimism Kahneman described is strongest about the thing you most want. Be straight about the inference: 62% is the average for major building projects, and applying it to one domestic bathroom is a reasoning step, not a measurement of bathrooms specifically. The direction holds even if the exact figure does not. Budget Direct found 72.7% of renovators named financial or unexpected costs as their top barrier, which is the same fallacy reported from the inside.

Flyvbjerg's fix is to plan slowly and act fast. The budget does not blow out during a long, careful design phase. It blows out when a tight deadline rushes the planning, locking in decisions that downstream trades then have to unpick at full rate. The homeowner who wants to start next month is the one most likely to finish at $36,450.

The television number is physically impossible, and it still sets the quote

Renovation television hands viewers an anchor that cannot be built. A Block "luxury bathroom" came in at around A$18,000, and that was after the contestants changed their minds, pulled the room apart and rebuilt it. A Block NZ foreman reportedly could not believe the figure. It sits roughly 20% below a real Australian bathroom ($22,500) before a single thing goes wrong, and the shows reach it by skipping the approvals process and editing weeks of work into apparent days.

The damage is in the anchoring. A renovator who starts from the TV number carries a gap of roughly $18,000, nearly the entire televised bathroom again, into their very first quote, and then meets the 62% overrun on top. The screen teaches a price that production logistics and bulk supplier deals make unrepeatable in a suburban house on a normal timeline.

The shows are also a genuine macro actor. A long-cited HIA estimate puts each airing of The Block at about $251 million of extra quarterly renovation investment, landing two quarters after broadcast. A television network moves national renovation spending at a scale that shows up in the economic data. The culture that inflates the expectation and the demand is the same culture that broadcasts the impossible number.

The deposit you cannot get back

The structural risk sits in the contract before the builder lifts a tool. When Porter Davis collapsed in March 2023, about 1,700 projects were left stranded, and the collapse exposed how deposits are held. Builders' deposits go into ordinary business accounts, not trust accounts. When a builder fails, the money is spent, and the homeowner becomes an unsecured creditor standing in a queue behind the banks. It is unprotected by design.

On a full-house renovation ($380,000) a 5% deposit is about $19,000. On a home extension ($165,000) it is about $8,250. For many households that is a car or a year of school fees sitting in an account they have no claim on if the company goes under. Some Porter Davis customers had even paid a premium for builder's warranty insurance that the builder never lodged with the state insurer, so they had bought a protection that did not exist.

The risk is rising. ASIC-sourced data shows 2,832 building companies entered insolvency in FY2024, up 28% on the year, on margins so thin that a single bad project can take a company down. Victoria did repay deposits up to 5% for the uninsured Porter Davis clients, but treat that as a one-off relief scheme for one collapse, not a standing national protection. There is no trust-account rule waiting to catch the next one.

People renovate for taste, and the risk is economic

People frame renovation as a lifestyle decision while its biggest danger is financial. Budget Direct's 2024 survey found the dominant reason people renovate is to update the style, at 29.7%, followed by comfort. Only about 4% said they renovate because it is cheaper than buying a new home. Almost nobody does it as a calculated financial move, yet over-capitalising is where the money is quietly lost.

That gap is why the loss on resale surprises people. Households optimise for how a room feels, the market prices what it will pay back, and the two rarely meet. The person who spends to update the style is not wrong to want a nicer kitchen. They are wrong only if they also believe the kitchen is an investment, because the quoted returns, generous as they are, still book a loss.

Hold the alternative up for scale. A full-house renovation ($380,000) is roughly 3.8 times the $100,000 it costs to transact out of a $1 million Sydney home and into a $1.5 million one, the agent's cut plus stamp duty. Moving is expensive and clumsy and emotionally unappealing. It is also, on these numbers, often the cheaper way to get a different house.

The planning number that actually protects you

Here is the arithmetic to do before anyone signs. Take the real price of the two rooms you want, a kitchen ($32,500) and a bathroom ($22,500), roughly $55,000 together. Add the measured overrun rather than hoping to beat it, which on a bathroom ($22,500) alone moves $22,500 toward $36,450. Hold a further 10 to 20% buffer in cash, not in a credit line, for the hidden-issue bills that arrive once the walls are open. Plan the design slowly and only then build quickly, because the rushed plan is what the overrun data punishes.

Treat every ROI promise from a party who profits from the job as marketing until an independent figure proves otherwise, because for Australian room-by-room returns no such figure exists yet. Confirm where your deposit is held and whether any warranty insurance has actually been lodged, in writing, before the money leaves your account. The renovation that goes well is the one priced for the overrun, buffered for the surprise, and bought with the knowledge that it buys a better home to live in, not a profit on the way out.

Common questions

How much does a kitchen renovation cost in Australia?

A full kitchen renovation lands at roughly kitchen renovation ($32,500) for a standard job, with budget updates well below that and large or premium kitchens running higher. A flat-pack kitchen ($5,500) is far cheaper if you keep the existing layout and plumbing. The single biggest cost drivers are moving services and upgrading finishes, so a cosmetic refresh and a full rebuild are very different numbers.

How much does a bathroom renovation cost?

A typical Australian bathroom renovation is about bathroom renovation ($22,500), with budget jobs under that and luxury work above ensuite territory ($26,000). Tiling, supplied and laid, is usually the largest single line, ahead of plumbing and electrical. Plan for the overrun: research on building projects points to budgets landing well above the first quote once the work begins.

Do renovations add value, and what is over-capitalising?

Sometimes, but less reliably than people assume. Agent and renovator estimates put kitchen and bathroom recovery at 50 to 85% of cost, which means even the optimistic end often books a loss on resale, and no independent Australian study confirms those figures. Over-capitalising is spending more than the local market will pay back, and the common rule of thumb is to keep improvements under about 10% of the home's value.

Why do renovations go over budget?

Because of the planning fallacy, the documented tendency to judge your own project by its best case. Across more than 16,000 building projects the average cost overrun is 62%, with a fat tail of much worse outcomes. The fix from the same research is to plan slowly and build fast, since rushed planning under a tight deadline is what forces expensive mid-job changes.

What happens to my deposit if my builder goes bust?

On most domestic contracts your deposit sits in the builder's ordinary business account, not a protected trust account, so if the builder becomes insolvent the money is usually gone and you join the queue as an unsecured creditor. The Porter Davis collapse stranded about 1,700 projects, some of whom had paid for warranty insurance the builder never lodged. Confirm in writing where your deposit is held and that any required insurance has actually been taken out before you pay.

Sources

Method & reuse. Figures are the typical 2026 cost (the midpoint of our price range) from Going Rate, which prices over 1,000 Australian services, cross-checked against the sources above. Each links to the live calculator, where you can run the numbers for your own job. Journalists and writers are welcome to cite these figures with a link to goingrate.com.au.

More cost research: The Cost of Dying in Australia · The Headstone Costs Nearly Twice the Cremation. Then the Lease Runs Out. · The $38,252 Wedding, Audited · The Wedding Tax: Why the Same Service Costs More With a Ring Attached · A Typical Engagement Ring Costs Over Six Times Suncorp's Base Jewellery Limit · Ending a Marriage Costs Ten Times the Divorce